
In the Aktobe region, Prime Minister of the Republic of Kazakhstan Olzhas Bektenov, using the examples of the Kazakhstan Oil Equipment Plant and the deep wool processing enterprise KazFeltec, familiarized himself with the execution of instructions from Head of State Kassym-Jomart Tokayev regarding the development of the manufacturing industry.
Attention was paid to expanding domestic production and increasing the share of high value-added products.
Deputy Akim of the Aktobe region Abzal Abdikarimov reported on the implementation of investment projects in the region. Over 10 months, investments in fixed capital exceeded 1 trillion tenge, increasing by 8.2%. Foreign direct investment doubled to $357.2 million. Projects in the fields of energy, mechanical engineering, food processing, and other sectors are being implemented in the region. The creation of a special economic zone is also being worked out, which will make it possible to attract 400 billion tenge in investments and create more than 1,500 jobs.
In the city of Aktobe, the Prime Minister inspected the production workshops of Kazakhstan Oil Equipment Plant LLP. 7.4 billion tenge has been invested in the development of the enterprise. With a capacity of 100,000–120,000 tons of products per year, the plant manufactures tubing and casing pipes, Christmas trees, gate valves, heat exchangers, and other oil and gas equipment. Over nine months of the current year, the output of casing pipes grew by 31.4% to 14,100 tons, and other oilfield equipment reached 7,400 tons (compared to 179 tons in the same period of 2025). The products are oriented toward the domestic market and contribute to import substitution.
The Head of Government was briefed on plans to expand production, which envisage the construction of a fourth workshop for the manufacture of medium- and high-pressure valves and gate valves. The investment volume is 700 million tenge, with launch scheduled for 2027. In addition, a project for a plant producing metal billets and parts by casting with an investment of 2 billion tenge is being developed.
Olzhas Bektenov also familiarized himself with the technological process of deep wool processing and the production of non-woven materials at KazFeltec LLP. Plant Director Yerlan Dzhanabergenov reported that the project was implemented in 2025 through private investment and with the support of the Industrial Development Fund. The total investment volume amounted to 5.3 billion tenge. The enterprise is equipped with machinery from the Italian company CORMATEX, which allows processing up to 3,600 tons of wool per year with an output of up to 2,200 tons of finished products. 50 jobs have been created.
The plant produces thermal and sound insulation materials from natural sheep wool used in construction, furniture, and other industries. Today, the enterprise purchases raw materials from peasant farms in the Aktobe, Atyrau, West Kazakhstan, and Zhambyl regions, ensuring guaranteed sales and income for the rural population. Currently, the products are sold on the domestic market, with entry into export markets envisaged in the future.
Prime Minister Olzhas Bektenov instructed the Akimat of the Aktobe region, together with relevant state bodies, to ensure the timely implementation of investment projects aimed at expanding domestic production, deepening raw material processing, and creating new jobs, while providing necessary assistance to investors and adhering to commissioning deadlines for production capacities.
Overall, according to the Ministry of Industry and Construction, the development of the manufacturing industry is accompanied by the launch of new productions and the expansion of the range of domestic products. Over 10 months of the current year, production volume grew by 9.3%. Since the beginning of the year, 125 projects worth 900 billion tenge have been launched. Special attention is paid to deepening raw material processing, developing automotive manufacturing and railway engineering, as well as forming industry clusters.
В Атырау +8.6